MIL-S-19557/5(AS)
APPLICABLE
PARAGRAPH OF
SPECIFICATION
After 300 hours of overrunning, the
starter
shall be subjected to 300 endurance
test cy-
cles. Lubricant addition or change
is per-
mitted only after the 300 endurance
test cy-
cles.
Extreme Temperature Operation:
4.5.10
Inlet Air Conditions
Ambient
Total Press.
Total
260
140
-65
90
680
+160
No. of cycles: 5
Consecutive Cyclical Operation:
4.5.11
Sustained Motoring:
Time (Minutes): 2
4.5.12
Vibration: MIL-STD-810, Method 514, Procedure I,
4.5.13
Curve F (Parts 1,2, and 3).
Slip Clutch Torque, Max (Lb-Ft): 1000
4.5.15.1
Shear Section Strength. Max (Lb-Ft): 1000
4.5.15.2
Containment Tests:
Applicable
4.5.18
HUB Containment Test:
4.5.18.1
Inlet Air Pressure (PSIA): 49
Inlet Air Temperature (°F): 345
Failure at No-Load:
4.5.18.2
Inlet Air Pressure (PSIA): 110
Inlet Air Temperature (°F): 680
Project No. 2995-N028-5